1. Study on the technology of reinforcing railway bridge in mining area | |||
WANG Changhao,ZHANG Wenquan | |||
Mine Engineering and Technology 19 July 2017 | |||
Show/Hide Abstract | Cite this paper︱Full-text: PDF (0 B) | |||
Abstract:Underground mining in Shitun coal mine is affecting security operations of Pangzhuang railway bridge. Based on the specific situation of railway bridge,adopted the measure that padded the bridge by building bricks and then set lifting steel beams etc. to ensure its safe operation through data analysis and subsidence deformation prediction. Which has achieved economic and social benefits and provided scientific reference for the safe mining under railway bridge with the similar condition. | |||
TO cite this article:WANG Changhao,ZHANG Wenquan. Study on the technology of reinforcing railway bridge in mining area[OL].[19 July 2017] http://en.paper.edu.cn/en_releasepaper/content/4738664 |
2. Dynamic-programming based model for phase-mining optimization in open-pit metal mines | |||
GU Xiaowei,XU Xiaochuan,WANG Qing | |||
Mine Engineering and Technology 14 December 2012 | |||
Show/Hide Abstract | Cite this paper︱Full-text: PDF (0 B) | |||
Abstract:Three important aspects of phase-mining must be optimized: the number of phases, the geometry and position of each phase-pit (including the ultimate pit), and the ore and waste quantities to be mined in each phase. A model is presented in this paper in which, a sequence of geologically optimum pits are first generated and then dynamically evaluated to simultaneously optimize the above three aspects, with the objective of maximizing the overall net present value. The model takes into full account of the dynamic nature of the problem with respect to both time and space, and is robust in accommodating different pit wall slopes and different bench heights. | |||
TO cite this article:GU Xiaowei,XU Xiaochuan,WANG Qing. Dynamic-programming based model for phase-mining optimization in open-pit metal mines[OL].[14 December 2012] http://en.paper.edu.cn/en_releasepaper/content/4503130 |
3. Ways of Enhancement of Power Generation Efficiency of Underground Coal Gasification -Integrated Gasification Combined Cycle Power Plants | |||
DUAN Tianhong,WANG Zuotang | |||
Mine Engineering and Technology 12 April 2011 | |||
Show/Hide Abstract | Cite this paper︱Full-text: PDF (0 B) | |||
Abstract:With the practical experience in the UCG power generation test in Huating Coal Group of China, nine ways of enhancement of efficiency of Underground Coal Gasification -Integrated Gasification Combined Cycle (UCG-IGCC) Power Plants are put forward which include selection of proper gasification agent flow rate, proper steam concentration in gasification agent, proper O2 concentration in gasification agent, the appropriate oxygen making process, appropriate overall rate of air separation system ,increase in temperature of gasifiers, control of the length of the reduction zone, increase in the inlet temperature of gas turbines, utilizing the sensible heat of the coal gas . | |||
TO cite this article:DUAN Tianhong,WANG Zuotang. Ways of Enhancement of Power Generation Efficiency of Underground Coal Gasification -Integrated Gasification Combined Cycle Power Plants[OL].[12 April 2011] http://en.paper.edu.cn/en_releasepaper/content/4419158 |
Select/Unselect all | For Selected Papers |
Saved Papers
Please enter a name for this paper to be shown in your personalized Saved Papers list
|
|
Results per page: |
About Sciencepaper Online | Privacy Policy | Terms & Conditions | Contact Us
© 2003-2012 Sciencepaper Online. unless otherwise stated