Authentication email has already been sent, please check your email box: and activate it as soon as possible.
You can login to My Profile and manage your email alerts.
If you haven’t received the email, please:
|
|
There are 2 papers published in subject: > since this site started. |
Results per page: |
Select Subject |
Select/Unselect all | For Selected Papers |
Saved Papers
Please enter a name for this paper to be shown in your personalized Saved Papers list
|
1. Low-temperature growth of highly c-oriented GaN films on Ag substrates with ECR-PEMOCVD | |||
WANG Shuai,QIN Fuwen | |||
Engineering and Technological Science 01 April 2013 | |||
Show/Hide Abstract | Cite this paper︱Full-text: PDF (0 B) | |||
Abstract:Highly-preferred GaN films are deposited on Ag prepared on siliconchip substrates using the electron cyclotron resonance plasma enhanced metal organic chemical vapor deposition (ECR-PEMOCVD). Trimethylgallium (TMGa) and N2 are employed as the source of Ga and N, respectively, and high purity H2 is used as carrier gas. The effect of deposition temperature on the as-grown GaN films is systematically investigated by in-situ reflection high energy electron diffraction(RHEED), x-ray diffraction(XRD) and scanning electron microscope(SEM). The results show that high-quality GaN films with high preferred orientation and smooth surface were successfully achieved on Ag at the proper deposition temperature of 485℃. | |||
TO cite this article:WANG Shuai,QIN Fuwen. Low-temperature growth of highly c-oriented GaN films on Ag substrates with ECR-PEMOCVD[OL].[ 1 April 2013] http://en.paper.edu.cn/en_releasepaper/content/4531543 |
2. E10. Project Management Model in Risky Environment | |||
Gryphon SOU | |||
Engineering and Technological Science 05 February 2005 | |||
Show/Hide Abstract | Cite this paper︱Full-text: PDF (0 B) | |||
Abstract:Project Management in risky environment is not an easy job. It requires a project manager to possess multi-skills of Risk Management. Management tools facilitate the decision-making of a project manager. However, selection of appropriate tools requires the project manager’s mastery of those tools. Risk Management Model is built on the processes of some best risk management practices. It enables a project manager to discharge his or her responsibilities effectively. Then, the assets of the organization will not be placed at risk in the course of Project Management. | |||
TO cite this article:Gryphon SOU. E10. Project Management Model in Risky Environment[OL].[ 5 February 2005] http://en.paper.edu.cn/en_releasepaper/content/1542 |
Select/Unselect all | For Selected Papers |
Saved Papers
Please enter a name for this paper to be shown in your personalized Saved Papers list
|
|
Results per page: |
About Sciencepaper Online | Privacy Policy | Terms & Conditions | Contact Us
© 2003-2012 Sciencepaper Online. unless otherwise stated